Project Details
The Project Consist of a 1.6 km Bridge connecting Bubyan Port by 35 km two-way road three lanes each, a dirt road that makes the base for a future rail way parallel to the main highway. In addition to the soil investigations and treatment.
Al-Shaheen Consultants work as a local sub consultant in joint venture with Louis Berger Group, Inc on the design review and supervision of construction.